From: route@monster.com
Sent: Saturday, April 16, 2016 2:05 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: NSN Construction Manager
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Billy
Pennington 176
O’Johnson Road London,
Kentucky 40741 (606)
224-7783 P.T.I.D.
# (001EXI01181) F.C.C.
call sign KI4FRJ OBJECTIVE: Seeking a
challenging position that will utilize my technical, organizational,
leadership qualities, while providing an opportunity for advancement within
the wireless telecommunications industry. ·
HIGHLIGHTS OF
MY QUALIFICATIONS: ·
Ericsson
3G/4G/LTE Certified LTE E Node B 4G Installation, Commissioning, Integration,
Troubleshooting, and quality assurance. Using both Smart Laptop and Manual
Integations. For AT&T/VZW/Sprint/Metro PCS ·
Nokia Flexi2
2G and 3G / Certified Nokia BTS Ultra site installation, commissioning,
integration troubleshooting, and quality assurance. ·
Kaelus PIM
Testing Certified. ·
Performed
quality assurance and site preparation/acceptance of LTE/UMTS/GSM sites ·
RF Drive
Testing. ·
Completed
Ericsson Certified LTE E Node B Integration, Commissioning and
Installation ·
Richardson,
TX ·
Completed
Nokia 3G Flexi Certification Training, Irving TX ·
Completed the
U.S. West TP 77350 Standards Test, Richardson, TX ·
Completed CDI
Central Office training based on the Southwestern Bell (SBC) Lexington, KY ·
Completed
Anritsu RF Line Sweep Training, Lexington, KY WORK HISTORY: Westel / Travcom /
Generac Aug. 2014 –Dec.
2014 Across the US Performing Install,
Integration Remote configuration of 3G Kentrox reporting systems on Generac
generators throughout 40 of the continues 48 states Completed Q.A. Site
documentation and captured screen shots. Parsons / Travcom /
Ericsson LTE RTU2 Tech May 2013 – Aug. 2014 Kentucky and
Tennessee market Performing Smart
Laptop and manual Integration and of Ericsson 6601/6206 LTE Indoor and
Outdoor Purcell Cabinets . DUL to DUS
migration and Automatic MR advanced call testing tool. Troubleshot T1,
Fiber, Ethernet connections on site. Integration of SIU
System Integration Unit Updated and loaded
cabinet software using WS-FTP WINFIOL Loaded site
specific Scripts Coordinated with
NIC for Software Upgrade Completed and
Verified Test calls and Speed (benchmark) test per Ericsson/ATT standards Completed Q.A. Site
documentation and captured screen shots. Parsons / Blue
Horizon Concepts, Team Lead Ericsson LTE RTU2 Tech May 2013 –
Aug. 2013 San Francisco bay
area, CA NORCAL market Performed
Installation, Integration and Troubleshooting of Ericsson 6601/6206 LTE
Indoor and Outdoor Cabinets T1, Fiber and Ethernet Troubleshot T1,
Fiber, Ethernet connections on site. Integration of SIU
System Integration Unit Updated and loaded
cabinet software using WS-FTP WINFIOL Loaded site
specific Scripts Coordinated with
NIC for Software Upgrade Completed and
Verified Test calls and Speed (benchmark) test per Ericsson/ATT standards Completed Q.A. Site
documentation and captured screen shots. Alliance SDS / Blue
Horizon Concepts, Team Lead of RF Tiger team Sept. 2011 – May
2013 Preforming Line
sweeps and PIM testing. Troubleshooting Lines, Antennas, PDUs, RET
controllers, co-site cabling and check spectrum for interference. With
Anritsu E Model sweep gear. Power plant swap outs and Ericson UMTS and LTE
design, layout and installation. Also Floor plan designed
and Implementation the DAS site at University of Kentucky Parsons / Blue
Horizon Concepts, Team Lead Ericsson LTE RTU2
Tech April 2011 – Aug.
2011 San Francisco bay
area, CA NORCAL market Performed
Installation, Integration and Troubleshooting of Ericsson 6601/6206 LTE
Indoor and Outdoor Cabinets T1, Fiber and Ethernet Troubleshot T1,
Fiber, Ethernet connections on site. Integration of SIU
System Integration Unit Updated and loaded
cabinet software using WS-FTP WINFIOL Loaded site
specific Scripts Coordinated with
NIC for Software Upgrade Completed and
Verified Test calls and Speed (benchmark) test per Ericsson/ATT standards Completed Q.A. Site
documentation and captured screen shots. Parsons / Blue
Horizon Concepts, Team Lead Ericsson LTE RT2
Tech Jan 2011 – April
2011 San Francisco bay
area, CA NORCAL market Performed
Installation, Integration and Troubleshooting of Ericsson 3106, 3206, 3518,
3418, 3018, Indoor and Outdoor Cabinets T1, Fiber and
Ethernet Troubleshooting T1,
Fiber and Ethernet connections on site. Integration of SIU
System Integration Unit Updated and loaded
cabinet software using WS-FTP WINFIOL Loaded site
specific Scripts Coordinated with
NIC for Software Upgrade Completed and
Verified Test calls and Speed (benchmark) test per Ericsson/ATT standards Completed Q.A. Site
documentation and captured screen shots. Parsons / Blue
Horizon Concepts, Team Lead Ericsson RTU2
Nov 2010 – Jan 2011 Parsons New
Orleans, LA Performed
Installation of Ericsson 3106 and 3206 Termination of RF
feeders T-1s,+24vdc indoors and 220vac to the outdoor cabinets. Mounted BBU unit
and configured for -48vdc Installed DC filter
and strapped battery’s Parsons / Blue
Horizon Concepts, Team Lead Ericsson LTE RTU2
Tech June 2010 -
Nov 2010 Parsons Boston, MA Performed
Installation, Integration and Troubleshooting of Ericsson 6206 LTE Indoor and
Outdoor Cabinets T1, Fiber and Ethernet Troubleshot T1,
Fiber and Ethernet connections on site. Integration of SIU
System Integration Unit Updated and loaded
cabinet software using WSFTP WINFIOL Loaded site
specific Scripts Performed 6 to 12
sector upgrade kits Coordinated with
NIC for Software Upgrade Completed and
Verified Test calls and Speed (benchmark) test per Ericsson/Metro PCS
standards Completed Q.A. Site
documentation and captured screen shots. Parsons /
Blue Horizon Concepts, Team Lead Nokia Flexi2G Tech NRTU2
March 2010 - June 2010 Parsons Maine / New
Hampshire ·
Performed
Integrations, Commissioning, and Installation of Nokia Flexi BTS.
Performing Q.A.-Site Surveys consisting of but not restricted to T1 testing
and verification of Circuit ID. ·
Nokia Flexi
Commissioning, T-I mapping .TRX testing, and then unlocking the site,
troubleshooting any Nokia Hardware or Software Issues. ·
Completed and
verified intra/intercellular test calls per 411,611,911 for each sector. 911
test calls verifying and logging phase 1 or Phase 2 info. Along with which
Emergency service was reached and what data they received on each test call. ·
Performed
lacing, securing, and wire wrapping of T1’s from the NIU to surge arrestors. ·
Running, connectorizing,
and RF jumper Lines from Hatch Plate to the BTS. ·
Performed
installation of Nokia Alarm cabling and 66 block termination of external
alarms cables inputs and termination external alarms coming from shelter and
other Equipment Located on the site, Door Open, High temp., Low Temp VDC
High, VDC Low, smoke detector and many more, Q.A reports and verifying all
pictures and Documentation associated with Q.A reports: Starting at the Gate
and covering every facet of the site indoors, and outdoors. ·
Completed
E-Folders, Extra Site Visit Reports (SVR), Site check list (outdoor then
indoor) , Checking Test Logs , Job Safety Reports , Daily Field
Reports, Picture Logs. Uploading Nokia Data to the Nokia Uplift
software.
Parsons Central
Oregon / Salt Lake City, UT ·
Performed
Integrations, Commissioning, and Installation of Single and Multi Cabinet
Nokia BTS. Performing Q.A.-Site Surveys consisting of but not restricted
to T1 testing and verification of Circuit ID. ·
Nokia
Commissioning, T1 mapping, TRX testing, and then unlocking the site,
troubleshooting any Nokia Hardware or Software Issues. ·
Completed and
Verified Intra/Inter cellular test calls and 411,611,911 for each sector. 911
test calls verifying and Logging phase 1 or Phase 2 info. Along with which
Emergency service was reached and what data they received on each test call. ·
Performed LMU
installation and commissioning. ·
Performed
cabling of T1’s from the NIU to surge arresters. ·
Installing
and weatherproofing RF jumpers from Hatch Plate/ feeders to the BTS. ·
Performed
cabling, turn up and troubleshooting of BIAS Tees. (TMA /MHA Power Supply). ·
Nokia Alarm
cabling and Termination of external alarms cables inputs and termination
external alarms coming from shelter and other Equipment Located on the site,
Door Open, High temp., Low Temp VDC High, VDC Low, smoke detector and many
more, Q.A reports and verifying all pictures and Documentation associated
with Q.A reports: Starting at the Gate and covering every facet of the site
indoors, and outdoors. ·
E-Folders,
Extra Site Visit Reports (SVR), Site check list (outdoor then indoor) ,
Checking Test Logs , Job Safety Reports , Daily Field Reports, Picture
Logs. Uploading Nokia Data to the Nokia Uplift software. SBA / S-Com,
Nokia BTS Lead Tech NRT3/ Ericsson RBS Lead Tech RTU2 May 2009 - Aug 2009 SBA Panama Beach/
Jacksonville, FL ·
Performed
Installation of Ericsson 3518 rack Mounts. Both indoors and outdoors. Along
with all associated cabling. ·
Performed
Installation of Ericsson 3106, and 3206. Both indoors and outdoors
applications. Along with all associated cabling. ·
Performed
Integrations, and Installation of Andrews RX-AIT rack. Replaced and removed
all old RF feed lines the site. According to the RFDS. ·
Nokia
Commissioning.TRX testing, Locking and unlocking the site, troubleshooting
any Nokia Hardware or RF line issues. ·
Completed and
verified test calls per 411,611,911 for each sector. 911 test calls verifying
and Logging phase 1 or Phase 2 info. Along with which Emergency service was
reached and what data they received on each test call. ·
Performed
cabling of T1’s from the NIU to surge arrestors. ·
Running RF
feed Lines from Hatch Plate to the BTS. ·
Performed
cabling and turn up of the P.D.U. (MHA Power Supply). ·
Nokia Alarm
cabling and Termination of external alarms cables inputs and termination
external alarms coming from shelter and other Equipment Located on the site,
Door Open, High temp., Low Temp VDC High, VDC Low, smoke detector and many
more, Q.A reports and verifying all pictures and documentation associated
with Q.A reports: Starting at the Gate and covering every facet of the site
indoors, and outdoors. ·
E-Folders,
Extra Site Visit Reports (SVR), Site check list (outdoor and indoor),
Checking Test Logs, Job Safety Reports , Daily Field Reports, Picture Logs.
Uploading Nokia Data to the Nokia lift software. Fusion Solutions,
Nokia FLEXI RTU2 Mar 2009 - Apr 2009 T-Mobile, Detroit
Michigan ·
Delivery of
equipment to the site ·
Performed
Installation of Nokia Flexi outdoors. Along with all associated cabling. ·
E-Folders,
Extra Site Visit Reports (SVR), Site check list (outdoor and indoor), Job
Safety Reports, Daily Field Reports, Picture Logs. Uploading Nokia Data to
the Nokia Uplift server. MBI, Nokia BTS Tech
NRT3 /Ericsson RBS Tech RT2 Sep 2008 - Oct 2008 Parsons Salt Lake
City, UT Performed site
survey for T-Mobile UMTS project consisting of the ground and tower
portion. Included but not limited to verifying BTS configuration, RF cabling,
Battery backup (BBU) type and size, Antenna orientation, T1 allocation,
availability, measuring the lease area and overall site layout. C.A.D.
Drafting. Taking photos (more than 100 per site) labeled verifying all the
above. MBI, Nokia BTS Tech
NRT3/ Ericsson RBS Tech RT/2 May 2008 - Oct 2008 Parsons New
Orleans, LA / Jackson, MS ·
Installed,
Commissioned, Integrated, Dual Banding, Expansions Complex, and Simple, Radio
adds. ·
Troubleshooting
of the Nokia Ultra site BTS cabinets, and troubleshooting Ericson UMTS ·
UMTS site
preps adding Duplexers and Diplexers and Line sweeps ·
Commissioning,
Integrations of the Hitachi and Power Wave MCPA. ·
Wire rapping
DSX panels and T-1 testing, Identifying ·
RF line
sweeps using Anritsu Site Master measuring return loss and distance to fault. ·
Proficient
with all power applications 24 and 48 volt. ·
Integration
and troubleshooting experience in a GSM and UMTS wireless setting. ·
Installation
and Integration of PURCELL outdoor powerbay ·
Installation
and Integration of Hitachi Outdoor MCPA ·
Performed
quality assurance and site preparation/acceptance Northstar
Communications, Construction Manager/ QC Manager, Nov 2007 - March 2008 T-Mobile Washington
DC / Baltimore, MD / Philadelphia, PA / Long Island, NY ·
Project
Coordination for Installation and Crews working on Ericsson Node B
Installation project for T-Mobile in the Washington DC and Baltimore
Maryland, Philadelphia Pennsylvania, and Long Island New York Markets. ·
Responsible
for the Design and implementation of Ericsson 3518 UMTS site design and build
out. ·
Reviewed
and completed close out packages for customer sign off of completed
sites. ·
Performed
site walk, bid walk and completed BOQ for ordering all necessary hardware to
construct build outs. ·
Coordinated
with Ericsson on how to complete, and design the frame work to mount
equipment/ ·
Walked
sites to determine proper placement of equipment. Worked directly with Northstar
Communications, Quality Control Manager
Nov 2007 – Dec 2007 Washington DC /
Baltimore, MD ·
Conducted
onsite Quality Audits for Cell Sites. ·
Disseminated
information and standards that was put into place in the Washington D.C.
Baltimore, MD Markets. ·
Travelled to
Philadelphia PA, and Long Island NY Markets, and conducting onsite Cell
Site audits and training. ·
Insured
quality, and uniformity throughout all the Northeast markets.
Northstar
Communications, Ericsson RBS Tech RT/2 Aug 2007 - Nov 2007 Washington DC /
Baltimore, MD ·
Onsite
Technical Trainer for all new hires ·
Installed and
powered up of over 100 Ericsson RBS 3106 outdoor and 50 plus RBS 3206 indoor
cabinets. Including RF cabling, AC and DC power cable terminations. ·
Ericsson 6500
power bays and batteries. ·
Oversaw the
loading and transportation of the new equipment to the site. ·
Returned old
GSM cabinets to the warehouse in box trucks and trailers. ·
Coordinated
and mapped cranes and movers, to multiple cell sites per day. ·
Consolidated
and removed existing Ericsson GSM cabinets (decommissioning) RBS 2106 and
2206. ·
Expanded cell
site, added new UMTS Installation powering up the Ericsson UMTS cabinets 3106
and the 3206. Parsons, Nokia BTS
Tech NRT3 Oct 2006 – Nov 2006 Washington DC /
Baltimore, MD ·
Installed,
Commissioned, Integrated, Expansions Complex, and Simple, Radio adds. ·
Troubleshooting
of the Nokia Ultra site BTS cabinets. ·
Performed
Commissioning of the IBBU (Integrated Battery Backup Unit) and BTS. ·
Hub Manager,
Installed and proficient with all power applications of the Ultra site
BTS. Integration and troubleshooting experience in a GSM wireless
setting. ·
Along with
N.U.S.S. Multi cabinet installs. Radio Hopping configuration, LMU,
(911-Location Measurement Unit) and EDGE upgrade and Radio ads. ·
Performed
quality assurance and site preparation/acceptance. Parsons, Nokia BTS
Tech NRT3 Aug 2006 - Sep 2006 New Orleans / Baton
Rouge, LA ·
Installed,
Commissioned, Integrated, Expansions Complex, and Simple, Radio adds. ·
Troubleshooting
of the Nokia Ultra site BTS cabinets. ·
Performed
Commissioning of the IBBU (Integrated Battery Backup Unit) and BTS. ·
Hub Manager,
Installed and proficient with all power applications of the Ultra site BTS. ·
Performed
Integration and troubleshooting experience in a GSM wireless setting. ·
Along with
N.U.S.S. Multi cabinet installs. Radio Hopping configuration, LMU,
(911-Location Measurement Unit) and EDGE upgrade and Radio adds. ·
Performed
quality assurance and site preparation/acceptance. Parsons, Nokia BTS
Tech NRT2 Apr 2006 - Aug 2006 Shreveport, LA /
Washington DC / Baltimore, MD ·
Performed
installation, commissioning, integration, Complex, and Simple expansion /
Radio adds. ·
Along with
troubleshooting of the Nokia Ultra site BTS cabinets. ·
Performed
Commissioning of the IBBU (Integrated Battery Backup Unit) and BTS. ·
Hub Manager,
Installed and proficient with all power applications of the Ultra site BTS. ·
Performed
Integration and troubleshooting experience in a GSM wireless setting. Along with
N.U.S.S. Multi cabinet installs. Radio Hopping configuration, LMU,
(911-Location Measurement Unit) and EDGE upgrade and Radio ads. ·
Performed
quality assurance and site preparation/acceptance. Parsons, Nokia BTS
Tech NRT2 Feb 2006 – Apr 2006 Birmingham,
AL/Jackson, MS ·
Performed
Integrations of Multi Cabinet Nokia BTS Performing Q.A.-Site Surveys
consisting of but not restricted to T-I testing and verification of Circuit
ID. ·
Nokia
Commissioning, T-I mapping .TRX testing, and then unlocking the site,
troubleshooting any Nokia Hardware or Software Issues. ·
Completed and
Verified Test Calls per 411,611,911 M.T.M M.T.L.L. for each sector. 911 test
calls verifying and Logging phase 1 or Phase 2 info. Along with which
Emergency service was reached and what data they received on each test call. ·
Performed
cabling of T1’s from the NIU to surge arresters. ·
Installed,
wire wrapped and configured DSX Panel and SIAD/ Carrier Access unit. ·
Continuing to
the Nokia BTS. Running R.F. feed Lines from Hatch Plate to the BTS. ·
Performed
cabling and turn up of the P.D.U. (MHA Power Supply). ·
Configured
the Internal Cross connects on the SIAD Flex master (carrier Access unit)
using Microsoft Hyper term Powering up new cell sites clearing any power
supply alarms (Emerson power bay) or unit malfunctions. ·
Nokia Alarm
cabling and Termination of external alarms cables inputs and termination
external alarms coming from shelter and other Equipment Located on the site,
Door Open, High temp., Low Temp VDC High, VDC Low, smoke detector and many
more, Q.A reports and verifying all pictures and Documentation associated
with Q.A reports: Starting at the Gate and covering every facet of the site
indoors, and outdoors. ·
E-Folders,
Extra Site Visit Reports (SVR), Site check list (outdoor then indoor) ,
Checking Test Logs , Job Safety Reports , Daily Field Reports, Picture
Logs. Uploading Nokia Data to the Nokia Uplift software. EXI, Nokia BTS Tech
NRT2 Oct
2005 – Feb 2006 Boston, MA /
Philadelphia, PA AT&T / Cingular
Wireless ·
Performed
Installations, Commissioned, Integrated, and troubleshooting of the 3G Nokia
Ultra site BTS. ·
Performed
Commissioning of the IBBU (Integrated Battery Backup Unit) and BTS. ·
Hub Manager. ·
Installed and
proficient with all power applications of the Ultra site BTS. ·
Performed
Integration and troubleshooting experience in a GSM wireless setting. ·
Along with
N.U.S.S. Multi cabinet installs. Radio Hopping configuration, LMU,
(911-Location Measurement Unit) and EDGE upgrade and Radio adds. ·
Performed
quality assurance and site preparation/acceptance. EXI, Nokia BTS Tech
NRT2 Jan 2005 – Oct 2005 Los Angeles, CA Cingular Wireless ·
Performing
Quality Audits, Site Exception, and Observation associated with the Nokia BTS
to Ericsson RBS swap-out. ·
Involving
every facet of the including but not limited to too the following: Clearing
and/or resolve any existing alarms issues. ·
The
Completion of all files, and updates with all applicable site documentation. ·
Also conduct
a basic site survey. ·
To assess,
determine any issues with further upgrades, or new builds. ·
Photo
documentation of the site and newly installed Ericsson equipment. ·
Cable
re-routing along with the cable mining of any remaining cabling. ·
Ericsson
cabinet cabling (internal and external). ·
Involving the
Ericsson, Power, RF jumpers, and RBS interconnections E-911 and WLS plus many
other tasks. Involved with being the last QA. ·
To visit
sites before the final acceptances by Ericsson and Cingular Wireless. Filing
all documentation and Photos to the proper personal ·
Performed -
Installations, and De-Install of the Nokia BTS. ·
Change the
Hardware configurations, to allow the Nokia BTS to operate correctly after
the MHA replace with the Ericsson’s higher gain TMA system. ·
Along with
GSM Radio expansions.(RADIO ADD ONS) Multi cabinet commissioned, Integrated,
and troubleshooting of the 3G Nokia Ultra site BTS. ·
Performed
commissioning/re-commissioning of the BTS and the IBBU (Integrated Battery
Backup Unit) and BTS. Hub Manager .Installed and proficient with all power applications
of the Ultra site BTS. Mycom, Nokia BTS
Tech NRT/2Jan 2002 – Feb 2004 Orlando, Fl ·
Performed
Installations, Commissioned, Integrated, and troubleshooting of the 3G Nokia
Ultra site BTS. ·
Performed
Commissioning of the IBBU (Integrated Battery Backup Unit) and BTS. Hub
Manager, Installed and proficient with all power applications of the Ultra
site BTS. Integration and troubleshooting experience in a GSM wireless
setting. Along with N.U.S.S. Multi cabinet installs. Radio Hopping configuration,
LMU, (911-Location Measurement Unit) and EDGE upgrade installation
experience. ·
Performed
quality assurance and site preparation/acceptance. References: Will be furnished
upon request |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||
|
|